Toyota of Huntington Beach

18881 Beach Blvd. Huntington Beach, CA 92648

2022 BMW M4 Competition at Toyota of Huntington Beach

2022 BMW M4 Competition

Selling Price : $65,988

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 24,947
  • VIN : WBS33BA0XNCJ97045
  • Stock # : 0220214A
  • Engine : Twin Turbo Premium Unleaded I-6 3.0 L/183
  • Transmission : 8-Speed Automatic w/OD
  • Ext. Color : Brooklyn Grey Metallic
  • Int. Color : Fiona Red/Black
  • Vehicle Type : Convertible
  • Body Style : Convertible
  • Drivetrain : AWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Driving Assistance Professiona , Parking Assistance Package,Executive Package. M Shadowline Lights,Carbon Fiber trim, Neck Warmer, Front ventilated seats. Looks and runs great. Good tires and brakes. Engine and transmission run smooth. Damage free. Immaculate inside and out. FREE CARFAX! We have great interest rate and financing for ALL credit situations.. Gray Metallic 2022 BMW M4 Competition AWD 8-Speed Automatic Steptronic 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hpRecent Arrival!WHY BUY at the BEACH? Our customers are our most valuable asset. If you are already a customer, welcome back. If you are new to Toyota of Huntington Beach, we would like to convince you to join the ranks of satisfied Toyota of Huntington Beach customers. Financing for all situations. Great rates available. GREAT rates for good credit. Financing for ALL credit situations. BK ok. Low score OK. (See dealer for details.) Se Hablamos Espanol. Marticular OK.

Browse Other Vehicles at Toyota of Huntington Beach

Dealership Info

Toyota of Huntington Beach

Toyota of Huntington Beach

Vehicle Features

  • FIONA RED/BLACK FULL MERINO LEATHER UPHOLSTERY (VB)
  • M SPORT SEATS -inc: Heated Front Seats (STD)
  • FRONT VENTILATED SEATS
  • M SHADOWLINE LIGHTS
  • ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT
  • DRIVING ASSISTANCE PROFESSIONAL PACKAGE -inc: Active Driving Assistant Pro Extended Traffic Jam Assistant For limited access highways
  • WIRELESS CHARGING
  • PARKING ASSISTANCE PACKAGE -inc: Drive Recorder Parking Assistant Plus
  • BROOKLYN GREY METALLIC
  • EXECUTIVE PACKAGE -inc: Remote Engine Start Head-Up Display Heated Steering Wheel
  • WHEELS: 19 X 9.5 FR/20 X 10.5 RR SILVER -inc: Style 826M M double-spoke
  • M COMPOUND BRAKES W/RED CALIPERS
  • NECK WARMER
  • CARBON FIBER TRIM
  • Turbocharged
  • All Wheel Drive
  • Active Suspension
  • Power Steering
  • ABS
  • 4-Wheel Disc Brakes
  • Brake Assist
  • Locking/Limited Slip Differential
  • Aluminum Wheels
  • Tires - Front Performance
  • Tires - Rear Performance
  • Heated Mirrors
  • Power Mirror(s)
  • Integrated Turn Signal Mirrors
  • Power Folding Mirrors
  • Rear Defrost
  • Intermittent Wipers
  • Variable Speed Intermittent Wipers
  • Rain Sensing Wipers
  • Rollover Protection Bars
  • Convertible Soft Top
  • Daytime Running Lights
  • Automatic Headlights
  • Headlights-Auto-Leveling
  • LED Headlights
  • Automatic Highbeams
  • AM/FM Stereo
  • Satellite Radio
  • HD Radio
  • Requires Subscription
  • MP3 Capability
  • Steering Wheel Audio Controls
  • Auxiliary Audio Input
  • Hard Disk Drive Media Storage
  • Satellite Radio
  • Requires Subscription
  • Premium Sound System
  • Bucket Seats
  • Power Driver Seat
  • Power Passenger Seat
  • Heated Front Seat(s)
  • Power Driver Seat
  • Power Passenger Seat
  • Pass-Through Rear Seat
  • Rear Bench Seat
  • Adjustable Steering Wheel
  • Trip Computer
  • Power Windows
  • Leather Steering Wheel
  • Keyless Entry
  • Power Door Locks
  • Keyless Start
  • Keyless Entry
  • Power Door Locks
  • Hands-Free Liftgate
  • Universal Garage Door Opener
  • Cruise Control
  • Climate Control
  • Multi-Zone A/C
  • A/C
  • A/C
  • Rear A/C
  • Leather Seats
  • Auto-Dimming Rearview Mirror
  • Driver Vanity Mirror
  • Passenger Vanity Mirror
  • Driver Illuminated Vanity Mirror
  • Passenger Illuminated Visor Mirror
  • Floor Mats
  • Mirror Memory
  • Seat Memory
  • Navigation System
  • Smart Device Integration
  • Telematics
  • Requires Subscription
  • Bluetooth Connection
  • Keyless Start
  • Power Door Locks
  • Power Windows
  • Trip Computer
  • Navigation System
  • Driver Adjustable Lumbar
  • Passenger Adjustable Lumbar
  • Pass-Through Rear Seat
  • Security System
  • Immobilizer
  • Traction Control
  • Stability Control
  • Traction Control
  • Front Side Air Bag
  • Rear Parking Aid
  • Blind Spot Monitor
  • Cross-Traffic Alert
  • Rear Collision Mitigation
  • Lane Departure Warning
  • Front Collision Mitigation
  • Driver Monitoring
  • Tire Pressure Monitor
  • Driver Air Bag
  • Passenger Air Bag
  • Passenger Air Bag Sensor
  • Knee Air Bag
  • Back-Up Camera
  • LED Brakelights
  • Headlights-Automatic Highbeams
  • Wheels: 19 x 9.5 Fr/20 x 10.5 Rr (Style 826M) -inc: M double-spoke bi-color
  • Tire Mobility Kit
  • Black Power Heated Side Mirrors w/Driver Auto Dimming Power Folding and Turn Signal Indicator
  • Galvanized Steel/Aluminum/Composite Panels
  • Body-Colored Front Bumper
  • Trunk Rear Cargo Access
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Light Tinted Glass
  • Front License Plate Bracket
  • Rocker Panel Extensions
  • Power Convertible Top w/Lining Glass Rear Window Automatic Roll-Over Protection Manual Wind Blocker and Top
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Tires: 275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
  • Black Grille
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Fixed Rear Window w/Defroster
  • Body-Colored Door Handles
  • Full Cloth Headliner
  • Perimeter Alarm
  • Driver And Passenger Heated Front Seat
  • Redundant Digital Speedometer
  • Remote Keyless Entry w/Integrated Key Transmitter 2 Door Curb/Courtesy Illuminated Entry Illuminated Ignition Switch and Panic Button
  • BMW Assist eCall
  • FOB Controls -inc: Keyfob Cargo Access Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
  • Power Fuel Flap Locking Type
  • Trip Computer
  • Radio w/Seek-Scan Clock Speed Compensated Volume Control Steering Wheel Controls Voice Activation Radio Data System External Memory Control and 20 Gb Internal Memory
  • Sport Leather/Metal-Look Steering Wheel
  • Rear HVAC w/Separate Controls
  • Instrument Panel Covered Bin Driver And Passenger Door Bins
  • Full Floor Console w/Covered Storage Mini Overhead Console and 3 12V DC Power Outlets
  • Remote Releases -Inc: Comfort Access Proximity Cargo Access
  • Delayed Accessory Power
  • Window Grid Antenna
  • harman/kardon Surround Sound System
  • Power Rear Windows
  • 16 Speakers
  • 600w Premium Amplifier
  • Illuminated Locking Glove Box
  • ConnectedDrive Services
  • 2-Way Power Passenger Seat -inc: Power Seatback Side Bolster Support Manual Cushion Extension and Power Rear Seat Easy Entry
  • Fade-To-Off Interior Lighting
  • Smart Device Integration
  • Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
  • Memory Settings -inc: Driver Seat and Door Mirrors
  • Full Folding Bench Front Facing Rear Seat
  • Live Cockpit Pro w/Navi
  • Garage Door Transmitter
  • Interior Trim -inc: Aluminum Instrument Panel Insert and Metal-Look Interior Accents
  • Leatherette Door Trim Insert
  • Day-Night Auto-Dimming Rearview Mirror
  • Compass
  • Cargo Space Lights
  • Cargo Area Concealed Storage
  • Gauges -inc: Speedometer Odometer Engine Coolant Temp Tachometer Turbo/Supercharger Boost Oil Level Oil Temperature Trip Odometer and Trip Computer
  • 2-Way Power Driver Seat -inc: Power Seatback Side Bolster Support Manual Cushion Extension and Power Rear Seat Easy Entry
  • Streaming Audio
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Driver And Passenger Auxiliary Mirror
  • Leather/Metal-Look Gear Shifter Material
  • Driver Foot Rest
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Tracker System
  • Integrated Navigation System w/Voice Activation
  • Immobilizer
  • Dual Zone Front Automatic Air Conditioning
  • HVAC -inc: Underseat Ducts and Console Ducts
  • Enhanced Bluetooth
  • Extended Merino Leather Upholstery
  • Driver Information Center
  • Outside Temp Gauge
  • 3 12V DC Power Outlets
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Power Door Locks w/Autolock Feature
  • SiriusXM w/360L
  • BMW TeleServices
  • Cargo Features -inc: Tire Mobility Kit
  • Front Cupholder
  • Artti Real-Time Traffic Display
  • Lumbar Support
  • 2 LCD Monitors In The Front
  • Rear Cupholder
  • M Sport Seats -inc: Heated Front Seats
  • Valet Function
  • Manual Tilt/Telescoping Steering Column
  • Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
  • Front Center Armrest and Rear Center Armrest w/Pass-Thru
  • Air Filtration
  • Power Front Seats
  • Front And Rear Map Lights
  • Cruise Control w/Steering Wheel Controls
  • Radio: AM/FM Audio System -inc: Apple CarPlay & Android Auto Compatibility
  • Gas-Pressurized Shock Absorbers
  • Engine: 3.0L 6-Cylinder TwinPower Turbo
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • Electric Power-Assist Speed-Sensing Steering
  • Part And Full-Time All-Wheel
  • 3.15 Axle Ratio
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative Alternator
  • Transmission w/Driver Selectable Mode and Oil Cooler
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Transmission: 8-Speed STEPTRONIC Automatic
  • 15.6 Gal. Fuel Tank
  • Front And Rear Anti-Roll Bars
  • Engine Oil Cooler
  • Engine Auto Stop-Start Feature
  • Strut Front Suspension w/Coil Springs
  • Electro-Mechanical Limited Slip Differential
  • 4-Wheel Disc Brakes w/4-Wheel ABS Front And Rear Vented Discs Brake Assist Hill Hold Control and Electric Parking Brake
  • Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Driver And Passenger Side Airbag Head Extension Driver And Passenger Knee Airbag
  • Dual Stage Driver And Passenger Front Airbags
  • Back-Up Camera
  • Driver Monitoring-Alert
  • ABS And Driveline Traction Control
  • DSC Electronic Stability Control (ESC)
  • Blind Spot Detection Blind Spot
  • Airbag Occupancy Sensor
  • Collision Mitigation-Front
  • Park Distance Control Front And Rear Parking Sensors
  • Lane Departure Warning
  • Tire Specific Low Tire Pressure Warning
  • Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
  • Side Impact Beams
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Rear Collision Prevention

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.