Toyota of Huntington Beach

18881 Beach Blvd. Huntington Beach, CA 92648

2022 BMW M3 Base at Toyota of Huntington Beach

2022 BMW M3 Base

Selling Price : $65,988

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M3
  • Condition : Used
  • Mileage : 42,237
  • VIN : WBS53AY09NFM25205
  • Stock # : 00P3009A
  • Engine : Twin Turbo Premium Unleaded I-6 3.0 L/183
  • Transmission : 6-Speed Manual w/OD
  • Ext. Color : Isle of Man Green Metallic
  • Int. Color : Black
  • Vehicle Type : 4dr Car
  • Body Style : 4dr Car
  • Drivetrain : RWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

EXECUTIVE PACKAGE. Looks and runs great. Good tires and brakes. Engine and transmission run smooth. Damage free. Immaculate inside and out. FREE CARFAX! We have great interest rate and financing for ALL credit situations.. Green Metallic 2022 BMW M3 RWD 6-Speed Manual 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 473hpRecent Arrival!WHY BUY at the BEACH? Our customers are our most valuable asset. If you are already a customer, welcome back. If you are new to Toyota of Huntington Beach, we would like to convince you to join the ranks of satisfied Toyota of Huntington Beach customers. Financing for all situations. Great rates available. GREAT rates for good credit. Financing for ALL credit situations. BK ok. Low score OK. (See dealer for details.) Se Hablamos Espanol. Marticular OK.

Browse Other Vehicles at Toyota of Huntington Beach

Dealership Info

Toyota of Huntington Beach

Toyota of Huntington Beach

Vehicle Features

  • Navigation System
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear window defroster
  • Head-Up Display
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Power Tailgate
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Extended Shadowline Trim
  • Heated door mirrors
  • Icon Adaptive LED Headlights w/Laserlight
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Enhanced Bluetooth
  • Front reading lights
  • Garage door transmitter
  • Gesture Control
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Live Cockpit Pro w/Navigation
  • M Drive Professional
  • M Shadowline Lights
  • Outside temperature display
  • Passenger vanity mirror
  • Rear reading lights
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Extended Merino Leather Seat Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 18x9.5 Fr. & 19x10.5Rr. M Orbit Gray
  • Wheels: 19x9.5 Fr. & 20x10.5 Rr M Black
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers
  • ISLE OF MAN GREEN METALLIC
  • M DRIVE PROFESSIONAL
  • FRONT VENTILATED SEATS
  • M SHADOWLINE LIGHTS
  • ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT
  • M SPORT SEATS (STD)
  • EXTENDED SHADOWLINE TRIM
  • M COMPOUND BRAKES W/RED CALIPERS
  • EXECUTIVE PACKAGE -inc: Power Tailgate Gesture Control Head-Up Display Heated Steering Wheel
  • WHEELS: 19X9.5 FR. & 20X10.5 RR M BLACK -inc: Style 826M Double-spoke Tires: 275/35R19 Fr & 285/30R20 Rr Performance Non run-flat
  • CARBON FIBER TRIM
  • BLACK EXTENDED MERINO LEATHER SEAT UPHOLSTERY
  • Turbocharged
  • Rear Wheel Drive
  • Active Suspension
  • Power Steering
  • ABS
  • 4-Wheel Disc Brakes
  • Brake Assist
  • Locking/Limited Slip Differential
  • Aluminum Wheels
  • Tires - Front Performance
  • Tires - Rear Performance
  • Heated Mirrors
  • Power Mirror(s)
  • Integrated Turn Signal Mirrors
  • Power Folding Mirrors
  • Rear Defrost
  • Intermittent Wipers
  • Variable Speed Intermittent Wipers
  • Rain Sensing Wipers
  • Rear Spoiler
  • Power Door Locks
  • Daytime Running Lights
  • Automatic Headlights
  • Headlights-Auto-Leveling
  • LED Headlights
  • Automatic Highbeams
  • AM/FM Stereo
  • Satellite Radio
  • HD Radio
  • Requires Subscription
  • MP3 Capability
  • Steering Wheel Audio Controls
  • Auxiliary Audio Input
  • Hard Disk Drive Media Storage
  • Satellite Radio
  • HD Radio
  • Requires Subscription
  • Premium Sound System
  • Bucket Seats
  • Power Driver Seat
  • Power Passenger Seat
  • Heated Front Seat(s)
  • Pass-Through Rear Seat
  • Rear Bench Seat
  • Adjustable Steering Wheel
  • Trip Computer
  • Power Windows
  • Leather Steering Wheel
  • Keyless Entry
  • Power Door Locks
  • Keyless Start
  • Keyless Entry
  • Power Door Locks
  • Hands-Free Liftgate
  • Universal Garage Door Opener
  • Cruise Control
  • Climate Control
  • Multi-Zone A/C
  • A/C
  • A/C
  • Rear A/C
  • Leather Seats
  • Auto-Dimming Rearview Mirror
  • Driver Vanity Mirror
  • Passenger Vanity Mirror
  • Driver Illuminated Vanity Mirror
  • Passenger Illuminated Visor Mirror
  • Floor Mats
  • Mirror Memory
  • Seat Memory
  • Keyless Start
  • Telematics
  • Requires Subscription
  • Bluetooth Connection
  • Navigation System
  • Smart Device Integration
  • Power Windows
  • Power Door Locks
  • Trip Computer
  • Driver Adjustable Lumbar
  • Passenger Adjustable Lumbar
  • Security System
  • Immobilizer
  • Traction Control
  • Stability Control
  • Traction Control
  • Front Side Air Bag
  • Rear Parking Aid
  • Blind Spot Monitor
  • Cross-Traffic Alert
  • Rear Collision Mitigation
  • Lane Departure Warning
  • Front Collision Mitigation
  • Driver Monitoring
  • Tire Pressure Monitor
  • Driver Air Bag
  • Passenger Air Bag
  • Front Head Air Bag
  • Rear Head Air Bag
  • Passenger Air Bag Sensor
  • Knee Air Bag
  • Child Safety Locks
  • Back-Up Camera

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.